Hello! Welcome to the official website of Shanghai Hufeng Machinery Co., Ltd.!
TEL:021-69116633 Email:hufengjixie@163.com
Converge industry wisdom to create quality independently
Integrating product research and development, production, sales, service, and undertaking steel connection and welding projects

Service Hotline
Subway No. 12, Gudai Road, Qixin Road
Shanghai Metro Line 12 (Line M2) has a total length of 40.4 kilometers, passes through 8 administrative districts, and has 32 stations all located underground. It is the diameter line connecting the west and northeast of Shanghai in the Shanghai urban rail transit network, and will become the main line running through the "southwest-northeast" axis of the central urban area. Line 12 starts from Qixin Road Station in Minhang District in the west, passes through the six central urban areas of Shanghai, namely Xuhui District, Luwan District, Jing'an District, Zhabei District, Hongkou District, and Yangpu District, and finally arrives at Jinhai Road Station in Pudong New Area, the end of the project. The project is still in progress, and a lot of machines and labor have been provided, and there are many types of steel bar connecting sleeves, such as reduced diameter, lengthened, upsetting, etc., and the amount used has reached more than 1 million, which lasted for more than 5 years.
Category:
Case
Contact Us
- Description
- Use
-
Shanghai Metro Line 12 (Line M2) has a total length of 40.4 kilometers, passes through 8 administrative districts, and has 32 stations all located underground. It is the diameter line connecting the west and northeast of Shanghai in the Shanghai urban rail transit network, and will become the main line running through the "southwest-northeast" axis of the central urban area. Line 12 starts from Qixin Road Station in Minhang District in the west, passes through the six central urban areas of Shanghai, namely Xuhui District, Luwan District, Jing'an District, Zhabei District, Hongkou District, and Yangpu District, and finally arrives at Jinhai Road Station in Pudong New Area, the end of the project.
The project is still in progress, and a lot of machines and labor have been provided, and there are many types of steel bar connecting sleeves, such as reduced diameter, lengthened, upsetting, etc., and the amount used has reached more than 1 million, which lasted for more than 5 years.