  • 03ffb48d-1e85-4f15-916e-b2652a700550.jpg

Shanghai Rail Transit Line 12 Line 10 Pujiang Main Substation

The construction qualification requirements are very high. Our company has passed the final requirements and accepted the project. Article 1 Municipal public works construction general contracting level and above As long as the bidder meets any of the above construction qualification requirements, multiple qualification requirements in the same article must be met at the same time. Other conditions: 1. Possess the first-level qualification for general contracting of municipal public works construction and above. 2. Possess performance in urban rail transit projects of the same type (underground stations) (subject to the contract). 3. The project manager to be dispatched should have the qualification certificate of municipal public utility first-class construction engineer (registered), and have construction management performance of similar (underground station) projects of urban rail transit (subject to the contract or owner's certificate). Our company meets the requirements and provides the engineering of the steel bar connection part The project is still in progress, and a lot of machines and labor have been provided, and there are many types of sleeves, such as reduced diameter, lengthened, upsetting, etc., and the amount used has reached more than 1 million, which lasted for more than 5 years.

Category:

Case


Contact Us
  • Description
  • Use
  • The construction qualification requirements are very high. Our company has passed the final requirements and accepted the project.

    Article 1 Municipal public works construction general contracting level and above

    As long as the bidder meets any of the above construction qualification requirements, multiple qualification requirements in the same article must be met at the same time.

    Other conditions:

    1. Possess the first-level qualification for general contracting of municipal public works construction and above.

    2. Possess performance in urban rail transit projects of the same type (underground stations) (subject to the contract).

    3. The project manager to be dispatched should have the qualification certificate of municipal public utility first-class construction engineer (registered), and have construction management performance of similar (underground station) projects of urban rail transit (subject to the contract or owner's certificate).

    Our company meets the requirements and provides the engineering of the steel bar connection part

    The project is still in progress, and a lot of machines and labor have been provided, and there are many types of sleeves, such as reduced diameter, lengthened, upsetting, etc., and the amount used has reached more than 1 million, which lasted for more than 5 years.