Hello! Welcome to the official website of Shanghai Hufeng Machinery Co., Ltd.!

Shanghai Rail Transit Line 12, Standard 10 Pujiang Substation
0.0
元
0.0
元
Category
Back to list
Case description
Parameters
The construction qualification requirements are very high, our company and the final requirements are all qualified, and take over this project.
Article 1 The first level of general contracting for municipal public works and above
As long as the bidder meets any of the above construction qualification requirements, multiple qualification requirements in the same article must be met at the same time.
Other conditions:
1. Qualified as a general contractor for municipal public works construction and above.
2. Achievement of similar urban rail transit (underground station) projects (subject to contract).
3. The project manager to be dispatched shall have the qualification certificate of first-class builder of municipal public utility (registered), and have the construction management performance of the same type (underground station) of urban rail transit (subject to the contract or the certificate of the owner).
Our company meets the requirements and provides the engineering of reinforced connection parts
The project is still in progress, providing a large number of machines and labor, and the types of sleeves are particularly large, reducing, lengthening, upsetting, etc., the amount has reached more than 1 million, which lasted more than 5 years.
Scan the QR code to read on your phone
Next
None
LINKS:Hufeng Alibaba Hufeng official website Shanghai Ding Rui Shanghai Zhongqi Steel Pipe Shandong Zhongfan Machinery Shoushang
CONTACT
Phone: 18016039660
E-mail:hufengjixie@163.com
Fax:021-39565956
Add:No. 1009 Fenghua Road, Jiangqiao Town, Jiading District, Shanghai
ATTENTION

Scan to browse the mobile station
Page Copyright-2020 Shanghai Hufeng Machinery Co., Ltd. 沪ICP备10016344号-1 Powered by www.300.cn